Construction, maintenance and project management of coastal, marine, environmental and civil projects.
Phone (03) 9589 6516 (03) 9589 6516
Search

Harbour Construction

Reconstruction of existing breakwater, construction of double lane precast concrete boat ramp and supply and installation of new floating jetty system

Stage 1: March 2001 - April 2001
Stage 2: March 2002 - May 2002
Stage 3: April 2004 - July 2004
Stage 4: Sept 2007 - Dec 2007
Stage 5: Apr 2011 - Jun 2011

Client: Colac Otway City Council, COLAC, Victoria

Works included:

  • Procurement and transportation of large armour rocks up to 18 tonne.
  • Procurement and delivery of specialised plant (including) 100 tonne crane, 45 and 50 tonne excavators with rock
    grable and 35 tonne 4WD dump truck.
  • Stabilisation of breakwater access track and site establishment.
  • Reconstruction of failed breakwater using 8-18 tonne rocks.
  • Reconstruction of precast boat ramp and concrete abutment.
  • Demolition of existing timber jetty
  • Supply and driving of steel pontoon piles
  • Supply and installation of new floating pontoon system

Information on: Harbour Construction in Australia, Breakwater construction, Rock groynes, Timber jetties, Wharf construction, Boat ramp construction, Engineering marine, coastal and environmental construction, Boat ramp construction.